Walnut Creek Hillside Detached ADU

Walnut Creek Hillside Detached ADU

This 1,200 sq ft detached ADU is built into a Walnut Creek hillside, pairing a master bedroom and two baths with an open-concept recreational and entertaining area.
ADU Type
Detached ADU
Duration
6 Months
Location
Walnut Creek, California
Size
1200
sq ft
The Opportunity

Building Into the Hillside

The property offered something most lots do not: elevation and a view. The challenge was turning a sloped hillside site into a comfortable, self-contained retreat, one designed less as a spare bedroom and more as a genuine destination for hosting family and friends.

Hillside site at 1340 Hermine Ave in Walnut Creek before ADU construction
Open-concept entertaining area inside the 1340 Hermine Ave detached ADU, Walnut Creek
What We Did

Engineered for the Slope

Vargas Construction designed and built a 1,200 sq ft detached ADU into the hillside over six months. The layout centers on an open-concept recreational area for entertaining, anchored by a master bedroom and served by two full bathrooms, delivering a complete, independent living space that works with the terrain rather than against it.

The Outcome

A Private Retreat for Entertaining

The finished ADU gives the homeowners a standalone space purpose-built for gathering, with an open entertaining area, a private master suite, and two full baths. Six months from start to finish, it adds both everyday livability and long-term property value.

Finished interior of the 1340 Hermine Ave hillside ADU in Walnut Creek
Transformation Gallery

Showcase Photos

View the dramatic transformations of the project, from the initial groundwork to the final touches.

1340 Hermine Ave Walnut Creek ADU construction progress, view 1
1340 Hermine Ave Walnut Creek ADU construction progress, view 2
1340 Hermine Ave Walnut Creek ADU construction progress, view 3
1340 Hermine Ave Walnut Creek ADU construction progress, view 4
1340 Hermine Ave Walnut Creek ADU construction progress, view 5
1340 Hermine Ave Walnut Creek ADU construction progress, view 6
1340 Hermine Ave Walnut Creek ADU construction progress, view 7
1340 Hermine Ave Walnut Creek ADU construction progress, view 8
1340 Hermine Ave Walnut Creek ADU construction progress, view 9
1340 Hermine Ave Walnut Creek ADU construction progress, view 10
1340 Hermine Ave Walnut Creek ADU construction progress, view 11
1340 Hermine Ave Walnut Creek ADU construction progress, view 12
1340 Hermine Ave Walnut Creek ADU construction progress, view 13
1340 Hermine Ave Walnut Creek ADU construction progress, view 14
1340 Hermine Ave Walnut Creek ADU construction progress, view 15
1340 Hermine Ave Walnut Creek ADU construction progress, view 16
1340 Hermine Ave Walnut Creek ADU construction progress, view 17
1340 Hermine Ave Walnut Creek ADU construction progress, view 18
1340 Hermine Ave Walnut Creek ADU construction progress, view 19
1340 Hermine Ave Walnut Creek ADU construction progress, view 20
1340 Hermine Ave Walnut Creek ADU construction progress, view 21
1340 Hermine Ave Walnut Creek ADU construction progress, view 22
1340 Hermine Ave Walnut Creek ADU construction progress, view 23
1340 Hermine Ave Walnut Creek ADU construction progress, view 24
1340 Hermine Ave Walnut Creek ADU construction progress, view 25
No items found.
No items found.
No items found.

Client Testimonial

Completed 1,200 sq ft hillside detached ADU at 1340 Hermine Ave in Walnut Creek, California

Walnut Creek, California

Transform Your Space with Us

Discover our expert construction and renovation services that bring your vision to life.